Type
Maritime
Customer
Fayard
Location
Denmark

Preparation wins new costumers

Because of the meticulous preparation, a Danish shipyard could offer their international costumers around three weeks less working hours than a similar foreign shipyard. The reduction in time commensurate an amount in the double-digit million range on cost savings, and therefore the Danish shipyard won the order. Specifically, the task consisted in a reconstruction of an oil tank, where a degassing system and a support structure became installed. We completed 3D scans of the oil tank, while it was at the sea. On these grounds, we could accomplish calculations and production before the arrival of the oil tank on the shipyard, with focus on only the installation and testing.

Our solution

  1. 3D scanning of oil tanks in the sea
  2. Idea development in consideration of the construction of the ship
  3. Design and dimensioning for foundation of systems
  4. Production of all parts for installation on vessels in dock
  5. Type approval and 3rd part certification at DNV-GL
"xxx" xxx xxx
Should we be at the forefront of your next project?
Send us an email info@flindtkristensen.dk