Towing of rig

When a rig was going in dry dock, the challenge was to secure both the dock and rig against damage, as the space was narrow. As the rig was already on its way to the dock, it was a requirement, that the process was ultra short, therefore the calculations and the design were made in 3 days. The work was carried out in cooperation with Lindø port of Odense, Fayard and Maersk.

Our solution

  1. Calculation
  2. Design
  3. Support
"It is a pleasure to see the projects, when they successfully become a reality." Patrick Falk Nybroe Stress Engineer/Flindt Kristensen