- Type
- Wind
- Customer
- Siemens Wind Power
- Location
- DK, UK
Universal storage bridge
Siemens Wind Power had developed a concept for the universal assembly of a tool for use at offshore parks throughout the world, but needed a maturing and certification of the concept in a very short time – the product was developed and certified by DNV-GL in 10 weeks.
Our solution
- Maturation and development of concept
- Calculation and analysis
- Test
- Certification at DNV-GL